The cavity of the shell matches the size of the carrier, and the transition part distributes the gas flow direction reasonably. For larger three-way catalytic converters, ribs will be reinforced on the shell structure to increase the height. The packaging process of the carrier is usually divided into three types. Type, bundled type and clamshell type, among which the plug-in type and bundled type have a lower potential impact on the carrier, while the clamshell type packaging has a higher impact. The advantages and disadvantages of the three coexist, and choosing the appropriate packaging process is an important operation.
Carfitment | ||||
OE NO. | Car Fitment: | Mold | Year: | |
- | Audi Q7 | 4.2L | 2007-2009 | |
Product name | Audi Q7 | |||
Model Number | DJN008 | |||
Brand Name | DJN | |||
Emission Standard: | EURO 2/3/4/5 | |||
Material | Inside : ceramic(honeycomb) substrate 400cpsi with mat | |||
Shell :304 or 409 # stainless steel shell,stainless steel pipe | ||||
Oxygen sensor ports | Yes | |||
cpsi | 400 /600/800 | |||
Wall thickness | 0.09±0.025 | |||
Warranty | 30000 miles performance/2 years | |||
Packaging: | Air bubble film and Carton Packing | |||
MOQ: | 50 pcs | |||
Supply Ability | 1000 Piece/Pieces per Week | |||
Place of Origin: | Jiangsu | |||
SAMPLE ORDER: | Accept | |||
Condition | new | |||
Function | reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency; | |||
Service | Customers' specific demands available, design drawings are welcomed. OEM service is accepted | |||
Supply Ability | 1000 Piece/Pieces per Month | |||
Packaging & delivery | Air bubble film and Carton Packing, inside fix the product decently with expanded material | |||
Port | Shanghai/Ningbo | |||
Lead time: | 10-30 days . | |||
Active catalyst ingredients | Pt, Pd, Rh, and rare earth elements | |||
Shape | round, oval, race track |